Planning

Earlier makes it better

As a service provider and partner when it comes to dealing with construction logistics challenges, we are by your side right from the start at the early planning stage.

We "translate" your plans into construction logistics phases. Very early on, we already give you a reliable feel for what your project, including the construction site set-up, will look like during the various construction stages. This also gives you optimum security with regard to the temporary infrastructure needed.

In the course of this, you will get an overview over which construction logistics resources are required at precisely which time and which place, independent of your procurement strategy. That is how we contribute to making construction processes more efficient in order to save valuable resources such as time, manpower, materials and costs.

Our services at a glance

  • We show you various construction schedule options.
  • We translate your schedule into logistics stage plans.
  • We calculate the manpower you need to realise your project.
  • We calculate the likely traffic volume.
  • We plan the horizontal transport routes (construction site access, on-site lanes, worker access etc.) and the vertical transport options (selection, dimensions, locations for lifting equipment, cranes etc.).
  • We plan your temporary infrastructure (temporary power supply, cabins and containers, temporary water supply, IT network, Wi-Fi etc.).
  • We draw up site concepts, waste management concepts, construction logistics stage plans and construction logistics manuals.
  • We give you a construction site set-up and construction logistics cost estimate.
  • We deal with the drawing up of your tender documents.

Who to contact

Frank Scheid

Frank Scheid

Authorised representative / Head of Planning

Location Essen
Rüttenscheider Str. 97a - 99
45130 Essen

Telephone: +49 201 33099513
Email: fscheid@site-log.com

You might also be interested in this

Waste management

Waste management

Waste is a huge money and time factor on construction sites. Particularly during the fit-out stage, when the deadlines are tight and a great number of companies are on site, waste management is an important aspect. Many trades are working in parallel in the same site areas. It seems inevitable that they will get in each other's way, which can lead to unpleasant situations and result in significant subsequent costs. Together with you, we will determine the right waste management concept for your construction site.

Learn more

Logistics management

Logistics management

Our aim is to intelligently plan and manage the traffic to and from your construction site in cooperation with cities and councils to ensure that the local traffic does not come to a standstill, to relieve the pressure on the infrastructure, and to spread the delivery flows. Let us manage the delivery flows to your construction site to perfection with our expertise and our tools.

Learn more

Construction site set-up

Construction site set-up

We supply all construction site set-up elements. During all stages of your project, a wide range of different equipment and storage facilities are needed. We consolidate the requirements of your construction site as well as those of all contractors and provide all construction site set-up elements regardless of the manufacturer centrally, efficiently and at a competitive price.

Learn more

Digitalisation

Digitalisation

With our own IT systems and their wide range of interfaces, we make construction logistics easier. All processes, from the supply logistics to access control, security and the waste management logistics, are supported by our own software developed especially for this purpose by us. Thanks to our outstanding efficiency and the dedication of our well-qualified staff, we achieve exceptional synergies.

Learn more

Access control

Access control

With the aid of our specially developed access control software, everyone who works on the construction site will be recorded and issued with respective site ID cards to ensure that only people who have the right to access the site can gain admittance once their identity has been verified.

Learn more

Temporary power supply

Temporary power supply

We will plan the temporary power supply infrastructure for your project, and will calculate your power requirements. In addition, we will help you with the network operator and energy supplier approval processes to ensure that sufficient power volumes are available on time. This also includes the coordination and preparation of all necessary documents.

Learn more

We LIVE sustainability

For us, sustainability is more than just a catchphrase without real meaning. Let us turn your project into a sustainable construction site.

Learn more